tEXTILE
TRAVELING CLEANER
Technology/Process Description:
The UNIROLS
traveling cleaner keeps textile machines and production areas clean. The
traveling cleaner travels on a straight track over one or more textile machines
in the same row. The liberated dust and fibers are sucked off by floor nozzles
and held inside the filter. At the end of the track, the filter is emptied by a
suction system and the waste is conveyed to a central waste collection system.

Traveling Cleaner
Systems for Spinning Machine
Technology/Product Specifications:
Features
|
Installed
power |
Kw |
1.5
/ 2.2 |
|
Air
flow Rate |
M3(Max) |
2000/2500 |
|
Pressure
Increase |
(PA) |
2250/2750 |
|
Nozzle
dia |
min/max(mm) |
8/35 |
|
Filter
surface |
Cm2 |
1600 |
|
Travelling
speed |
m/min |
12 |
|
No.
of blowing tubes |
mm
dia |
2or4/125 |
|
No.
of suction tubes |
mm
dia |
4/100 |
|
Total
weight of unit |
Kg |
70 |
Company Profile
|
Company Name |
Unirols Airtex |
|
Address |
21/12 A&B, Ramasamy Nagar,
Chinniyampalayam, Coimbatore-641062, Tamil Nadu, India |
|
Contact person |
Mr. A.R.Shaankar |
|
Phone |
+91-422-2628938,09442105531 |
|
Fax |
+91-422-2629372 |
|
E-mail |
|
|
Web Site |
|
|
Year of Establishment |
1994 |
|
Product(s) Manufactured |
Textile Overhead Cleaner |
|
Production (FY-05) (Products
contributing most to the sales) |
Textile Overhead Cleaner-1000 |
|
Sales Turnover |
FY 05: USD 1.0
Mn FY 04: USD 0.6 Mn
FY 03: USD 0.4 Mn |
|
Conformity to Standards |
Indian |
|
Compliance to ISO |
ISO 9001:2000 |
|
Foreign Collaboration |
Nil |
|
Manpower Total (Nos.) |
50 |
|
Raw Materials / Equipment used |
Steel, Welding Machine, Power
Press, Sheetmetal making components, Measurement Testing Equipment |
|
Effluent Generated |
Non Polluting |
Broad Profile of Project
Offer
|
Project |
To Manufacture Textile Traveling Cleaner |
|
Capacity per Annum |
1200 |
|
Land Requirements/ Building Requirements |
3000 Sq. M |
|
Plant & Machinery and Test
Equipment |
Power Press, Welding Machine, Sheet metal Making
Components |
|
Electrical Installation |
50 HP |
|
Implementation Period |
5 Months |
|
Manpower Required |
50 |
|
Raw Materials / Equipment Required |
Steel, Welding Machine, Power Press, Sheet metal making
components, Measurement Testing Equipment |
|
Total Project Cost |
USD 0.2 (Approx.) |
|
Expected Annual Sales |
USD 0.14 Mn |
|
Profitability |
7 % |
|
Form of Offer |
Turnkey Project |