tEXTILE TRAVELING CLEANER

Technology/Process Description:

The UNIROLS traveling cleaner keeps textile machines and production areas clean. The traveling cleaner travels on a straight track over one or more textile machines in the same row. The liberated dust and fibers are sucked off by floor nozzles and held inside the filter. At the end of the track, the filter is emptied by a suction system and the waste is conveyed to a central waste collection system.

 

Traveling Cleaner Systems for Spinning Machine

 

Technology/Product Specifications:

Features

Installed power

 Kw

 1.5 / 2.2

 Air flow Rate

 M3(Max)

 2000/2500

 Pressure Increase     

 (PA)

 2250/2750

 Nozzle dia

 min/max(mm)

 8/35

 Filter surface

 Cm2

 1600

 Travelling speed

 m/min

 12

 No. of blowing tubes

 mm dia

 2or4/125

 No. of suction tubes

 mm dia

 4/100

 Total weight of unit 

 Kg

 70

                                                                     
Company Profile

Company Name

Unirols Airtex

Address

21/12 A&B, Ramasamy Nagar, Chinniyampalayam, Coimbatore-641062, Tamil Nadu, India

Contact person

Mr. A.R.Shaankar

Phone

+91-422-2628938,09442105531

Fax

+91-422-2629372

E-mail

unirols@vsnl.com

Web Site

www.unirolsairtex.com

Year of Establishment

1994

Product(s) Manufactured

Textile Overhead Cleaner

Production (FY-05) (Products contributing most to the sales)

Textile Overhead Cleaner-1000

Sales Turnover

FY 05:  USD 1.0  Mn

FY 04:  USD 0.6 Mn 

FY 03:  USD 0.4 Mn

Conformity to Standards

Indian

Compliance to ISO

ISO 9001:2000

Foreign Collaboration

Nil

Manpower Total (Nos.)

50

Raw Materials / Equipment used

Steel, Welding Machine, Power Press, Sheetmetal making components, Measurement Testing Equipment

Effluent Generated

Non Polluting

 


 

Broad Profile of Project Offer

 

Project 

To Manufacture Textile Traveling  Cleaner

Capacity per Annum

1200

Land Requirements/ Building Requirements

3000 Sq. M

Plant & Machinery and Test Equipment

Power Press, Welding Machine, Sheet metal Making Components

Electrical Installation

50 HP

Implementation Period

5 Months

Manpower Required

50

Raw Materials / Equipment Required

Steel, Welding Machine, Power Press, Sheet metal making components, Measurement Testing Equipment

Total Project Cost

USD 0.2 (Approx.)

Expected Annual Sales

USD  0.14 Mn

Profitability

7 %

Form of Offer

 Turnkey Project

 

Home

Table of Contents

Search

Previous

Next